| Date: |
5-3-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Clamp and drill trim tab hinge to elevator |
|
|
Cut small bocks of wood to wedge loose hinge to elevator spar - worked well and kept things well lined up. Used spare piece of hinge material to line up / measure gaps; drilled one hole on each end to set line, then drilled holes in between. Drilling went well with no problems. |
||