| Date: |
2-26-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Attached ribs and check fit - verify placement |
|
|
Rechecked all ribs, clecoed to front and rear spar. Checked placement of outer nose ribs. checked angle of inner ribs and nose ribs (11 d off 90). Discovered that attach brackets were originally positioned correctly. Checked, double checked, triple checked, checked plans again. I had them right to begin with. However a couple of the drilled out holes are not acceptable and I will be replacing the entire front spar. Holes looked oblong and over sized. may remake attach brackets for the experience |
||