Date:    11-2-2005
Number of Hours:    3.00
Brief Description:    Rudder
Anytime I have someone visit I'm always asked about the airplane I'm building. If I can I set up the garage and get them involved in a little bit of the construction of the RV-8......10/19/05 Riveting the rudder......11/2/05 Image 2 shows Jack Cawley and I rolling the leading edges with a good ole broom handle....11/2/05 Image 3 shows Margaret Cawley and I match drilling and eventually blind riviting the rolled edges of the rudder....3hrs