Date:    2-24-2007
Number of Hours:    14.00
Brief Description:    Match drilling the Right Wing
Like a big erector set. Match drilling all the parts is always a challengedyet a very necessay and important process. Lining up the tank spacers is a challenge because all the bolts have to be correct. Make sure you mark each spacer so you can put them on the tanl spar correctly