| Date: |
4-18-2019 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
glass work |
|
|
Started in on the tedious glass work for the empennage fairing. I purchased mine after market from Fairings etc. The fit out of the box was pretty good but with the 1/4" left offset of the vertical stab I had to cut and add 9oz cloth to get it perfect. At this point Im about 1/2 way there. |
||