Date:    3-29-2018
Number of Hours:    8.00
Brief Description:    Empenage attached
When the horizontal and vertical were attached I installed the rudder and elevators, and set the up and down travel. The rudder has a prefab UHMW plastic block that gets bolted on with a preset angle. When it was attached it worked pretty slick.