Date:    2-5-2018
Number of Hours:    18.00
Brief Description:    Added all forward longerons and bulkheads
After several days of hard work crawling on the floor and reaching over the side I was able to wrap up the fitting and drilling of the longerons and bulkhead. Having a pillow for my knees made the job more bearable.