| Date: |
2-5-2018 |
|
| Number of Hours: |
18.00 |
|
| Brief Description: |
Added all forward longerons and bulkheads |
|
|
After several days of hard work crawling on the floor and reaching over the side I was able to wrap up the fitting and drilling of the longerons and bulkhead. Having a pillow for my knees made the job more bearable. |
||