| Date: |
5-27-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Pitot & Static Testing - Part 1 |
|
|
Precision Static and Calibration came out to do an IFR pitot/static test this afternoon. Went through the GRT HX dual AHRS calibration and checkout. System had zero leaks and was within 0 to 5 ft across 0 to 30000 ft. Woo hoo! One less thing before the test flight! |
||