| Date: |
11-26-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Front Baggage Door Strut Installation - Part 2 |
|
RV-8 Baggage Door StrutHere is the on-line web page for the part: I used three standard LP4-3 pop rivets on the top attachment hinge to the side of the baggage door, and two #8 platenuts and screws on the lower attachment. For the correct geometry, you'll want to mount the upper hinge exactly 11/16" from the bottom of the door as shown in the pictures. The lower hinge should be mounted exactly 8.0" from the exterior skin of the fuselage as shown in the picture. |
||