| Date: |
9-27-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
More finishing work ... |
|
|
Fitted the last of the scat tubes - the air in-flow for the cabin heat muff. Installed the console and onnected the fuel lines to the fuel valve and to the firewall. |
||