Date:    5-3-2013
Number of Hours:    7.00
Brief Description:    Rigging day ...
Started with some corrcetive electrical work to get the panel organised - extending some leads and swaping some leads over - then reinstalled the panel. Spend an hour trying to set-up the flap controller but will have to contact the supplier for advice.....

Then worked on the rigging. Had plenty of travel left toi centre the elevator trim. I cut some access space through the seatback side to access the flap push tube to make final adjustments to the flaps (the 2 sdies were about 5mm about of alignment). Then I adjusted the push tubes for the ailerons so they were in the neutral position with the stick centred.