Date:    11-7-2008
Number of Hours:    7.00
Brief Description:    Glassing HS to VS fairing
Bolted the HS to the fuse and glassed top joint. Rolled the aircraft and glassed the bottom joint. Started filling and flushing the bottom fuse joint seam.