| Date: |
6-1-2013 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Continued tidying of the electrics |
|
|
Good run today. Finished grouping all the cables on the back of the panel - then rerouted cables away from the edges of the panel (they were fouling the edge when installing the panel). Then taped the bundeled cables into a harness. Then moving into the plane to do the same work with all the matching cables in the plane. Strated by grouping them to match the panel connectors - then extended some and shortened others so the cables collected tidily to be joined into the group connectors. Completed the positive power side today (1 x 8 pin and 1 x 2 pin connectors). UPS tracking says the propeller has passed through Singapore - so it should be here on Tuesday! |
||