Date:    4-25-2013
Number of Hours:    9.00
Brief Description:    Panel prep.
A long day chasing down the last of the wiring. Peter T was working on his plane 2 hangars down so I picked his brain multiple times to interpret all of the wiring diangrams and instructions. Had to wire up a 9 pin plug - very fiddly soldering - took 2 hours to get it right. Did all the final connections (chasing wiring and fitting connectors).