| Date: |
4-25-2013 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Panel prep. |
|
|
A long day chasing down the last of the wiring. Peter T was working on his plane 2 hangars down so I picked his brain multiple times to interpret all of the wiring diangrams and instructions. Had to wire up a 9 pin plug - very fiddly soldering - took 2 hours to get it right. Did all the final connections (chasing wiring and fitting connectors). |
||