Date:    4-7-2012
Number of Hours:    5.00
Brief Description:    Preparation of the final panel.
Locating the face panel on the main (support panel) and adjusting all holes and cut-outs. Locating all the engraved sub-panels and back and match drilling. More engine bay wiring to get everything through the firewall.