| Date: |
4-7-2012 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Preparation of the final panel. |
|
|
Locating the face panel on the main (support panel) and adjusting all holes and cut-outs. Locating all the engraved sub-panels and back and match drilling. More engine bay wiring to get everything through the firewall. |
||