| Date: |
3-31-2012 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Fitting cable glands to pass cables through the fi |
|
|
Drilled the firewall to take 4 cable glands. Fitted the glands and pulled the first of the electric cables through the firewall. |
||