Date:    3-17-2017
Number of Hours:    1.00
Brief Description:    Fuselage- Rudder Pedal Part 2
Drill the 1/4" dia holes in the sliding tube for pedal postion adjustment

Finalized drilling the pedal end blocks through the tube.