Date:    3-15-2017
Number of Hours:    1.00
Brief Description:    Fuselage - Rudder Pedals
- Started the Rudder Pedal assembly by fitting the sliding tube on the FWD floor in order to match drill the hole from the socket throught the sliding tube

- Fitted the pedal on the sliding shaft, and started drilling the end bocks.