| Date: |
6-6-2016 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Fuselage - L/G box weldment riveting |
|
|
Now with the fwd floor assembly behind me, I can start final assembly the fwd fuselage. First order of the day was to install L/G box RH an LH permanently on the fwd floor. I started by final riveting the L/G Box weldment WD822 with the numerous AN470AD4-5 rivets. Most of the rivets installed easily. I had some issue with a few, considering limited space for bucking bar, and handling the rivet gun at the same time. I worked an estimated 1.5 hours riveting |
||