Date:    5-26-2016
Number of Hours:    0.00
Brief Description:    Fuselage - FWD Floor reworks
Tonight, I installed two missing NAS2097AD5-4 rivet in lieu of AN426AD4-4 to finalize installation of F836R-1 and F836L-1 on fwd floor F822-1.

I tried to install rivet joining F836 with F802M and F802L-1, but again I will need a corner drill to match drill the holes.