| Date: |
3-14-2016 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Fuselage - Center Section assembly |
|
|
This afternoon, from 14h30 until 17h30, I worked on assembling the center section again. I riveted F804L RH and LH, then installed the vertical bars F804G per drawing. It turned out the AN426AD4-14 rivets called out on drawing appears to be too short. I didn't not get an appropriate bucked end on the rivets, much too small. Will likely replace those rivets. |
||