| Date: |
3-7-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Fuselage - Firewall and L/G Box assy |
|
|
On that day, I finalized Firewall assembly by adding two nutplates, then installing the F801L parts to from face of firewall. I then moved to assembling the right hand L/G box by riveting the angles to it. I cleco the same angles to the LH L/G box following that I worked from 15h45 until 18h00, then from 20h00 until 22h00 |
||