| Date: |
11-24-2015 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Fuselage - FWD baggage bay floor & bulkhead |
|
|
ow, I am working on the FWD Fuse sub-structure (Ref: DWG 63), continuing on the FWD Baggage Bay Floor panel, then on the LWR and UPPER FWD Baggage Bay Bulkhead. I did that day: - Match drill F870B-1 and F870E-1 with skin Panel F820 LH and RH - Scuffed F870B-1 and F870E-1 - Dimple F870B-1 and F870E-1 - Bulkheads F866A and F866B match drilled with F802N Cross brace, hole deburred and dimpled In addition, I worked on FWD Floor Assy parts (Ref DWG 61) - Drilled all dia #40 holes full size & deburr on parts F802L-1 and F802K-1 - Scuffed these parts I worked from 15h00 until 18h15 no pics |
||