| Date: |
11-10-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
MLG boxes assembly pre-fit |
|
|
During that evening work session, I scuffed all the parts on the MLG Box assembly (per ref DWG 62), and did the required fluting on the box webs. Then I assembled the box with cleco again I worked from 19h45 until 21h30 |
||