| Date: |
4-6-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Welding on rudder pedals and belcrank |
|
|
Welding on rudder pedals and belcrank for activation of elevator push-pull rod. The aluminum foil around the belcrank is an argon dam to hold the argon in place around the control rod because I had to extend my tungsten to an excessively long stickout to reach inside for the last weld. |
||