| Date: |
9-1-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
installed aft spar carry-through |
|
|
installed the aft spar carry-through. aligned wings using fluorescent masonry twine, which came out looking like lazer beams in the photos. that looks kind of cool. I installed it temporarily with 3/16" machine screws. after I am sure everything came out square I will ream those out to !/4" per the plans. |
||