| Date: |
10-30-2010 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
spar riveting revision to method |
|
|
As I was riveting the rivets near the rib attach angles, I found some interference between the angles and the big block of steel I had my universal head rivet squeezer cup mounted on. So I removed that assembly, put on the revolving base plate that came with the arbor press, and installed a base removed from a C-frame dimple fixture. This gave me a narrow post to mount the squeezer cup on, allowing it to get much closer to the rib attach angles. |
||