| Date: |
10-8-2010 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
tape rivets in spar caps for inspection |
|
|
I taped the rivets in place on the spar caps, and set the left spar aside to wait for a tech counselor inspectiton. Then I put the rivets into the right spar caps and began attaching the rib attach angles. this was a slow process because all the rivets I had cut down from -12 to -11 had a little burr on the side that prevented the rivets going in right. So before I could put the rivets in place I had to sand off those burrs. |
||