| Date: |
9-3-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Panel install |
|
|
Picked up the panel from the paint shop after drying. Spent some time getting the behind panel ready for installation. Soldered in the TO/GA switch. Connected the GDL D-Sub connector and mounted the GDL. Installed the BNC connector. Started he panel install. |
||