Date:    7-14-2012
Number of Hours:    2.00
Brief Description:    Top skins
Added forward top skin and then match drilled the skin. Then drilled the stiffeners. Added the F-709 bulkhead then drilled. Pulled out the F-6111 ribs and will work on these later.