| Date: |
7-14-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Top skins |
|
|
Added forward top skin and then match drilled the skin. Then drilled the stiffeners. Added the F-709 bulkhead then drilled. Pulled out the F-6111 ribs and will work on these later. |
||