| Date: |
5-25-2012 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Primed F-711 and started longerons |
|
|
Primer was dry on the F-711 parts so I riveted them together. Started bending the left longeron and drilling the F-721-B in place. |
||