| Date: |
5-19-2012 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Back to F904 |
|
|
Spent the morning working on the F904 bulkhead. Riveted the F904-C uprights to the F904-A and F904-B. Fabricated the control stick mounts. This required match drilling to the F904-B and then cut away excess aluminum to save weight. Bolted these in place and then started assembling the control sticks. Lots of little bolts, nuts and washers that took a while to find the right storage bags. Pulled the control sticks back off and put in storage. |
||