| Date: |
1-12-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Tank baffle |
|
|
Sealed and installed rear tank baffle along with tank attach angles. Set tank on wing for now. I will wait a few days and the pressurize the tank to check for leaks before bolting down for good. |
||