Date:    12-24-2011
Number of Hours:    6.00
Brief Description:    Left tank work
Installed ribs in tank skin, attached baffle and temporary riveted the attach angles. Installed on wing spar and match drilled attach angles to spar, drilled splice place and inboard attach angle in assembly.