Date:    2-8-2008
Number of Hours:    3.75
Brief Description:    Map box installation
Today I fabricated the angles that hold the aft end of the map box at the sub panel match drilling them to the sub panel and then deburred everthing. I also fabricated the reinforcement angle that is nested in the right forward canopy deck in the trimmed away area for map box accommodation.