| Date: |
2-8-2008 |
|
| Number of Hours: |
3.75 |
|
| Brief Description: |
Map box installation |
|
|
Today I fabricated the angles that hold the aft end of the map box at the sub panel match drilling them to the sub panel and then deburred everthing. I also fabricated the reinforcement angle that is nested in the right forward canopy deck in the trimmed away area for map box accommodation. |
||