| Date: |
2-6-2008 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Map box preparation |
|
|
Today I assembled and match drilled the two halves of the map box. Then I cut the instrument panel and sub panel holes as well as trimming the right forward conopy deck to accomodate the map box. |
||