Date:    2-6-2008
Number of Hours:    3.00
Brief Description:    Map box preparation
Today I assembled and match drilled the two halves of the map box. Then I cut the instrument panel and sub panel holes as well as trimming the right forward conopy deck to accomodate the map box.