| Date: |
4-7-2010 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
First aid kit retainer bracket riveting... |
|
|
After having fabricated the retaining brackets for the first aid and survival yesterday I riveted all the brackets in place today. Following this I installed all the wing lower surface inspection panels. Lastly I installed the right wing to body fairing. |
||