| Date: |
9-13-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Upper cowling oil filler door installation |
|
|
After bonding on the upper cowl oil filler door opening back up ring yesterday I removed the excess fiberglass, trimmed the opening to fit the door hinge, drilled the door hinge to the door and cowling and lastly began the door latch installation. |
||