| Date: |
9-12-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Upper cowling oil filler door fabrication |
|
|
In another short work session I cut the opening in the upper cowling for the oil filler door. Then I bonded on a back up ring for the door to rest on when it is in the closed position. While the epoxy was curing I fabricated cylinder 2 and 4 upper ignition leads. |
||