Date:    9-12-2009
Number of Hours:    3.00
Brief Description:    Upper cowling oil filler door fabrication
In another short work session I cut the opening in the upper cowling for the oil filler door. Then I bonded on a back up ring for the door to rest on when it is in the closed position. While the epoxy was curing I fabricated cylinder 2 and 4 upper ignition leads.