| Date: |
11-5-2008 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Engine baffle preparation |
|
|
Today I prepared the side baffles of cylinders 1 and 2 by edge finishing them, then drilling, deburring and dimpling the attaching doubler plates. Following this I edge finished two baffle support brackets and drilled the bolt holes to final size. I finished the day by fabricating an attach bolt bushing. |
||