| Date: |
11-2-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Engine baffle preparation |
|
|
Today I pulled the engine baffle kit out of storage. I prepared the engine aft baffles and aft side baffles by match drilling them together with each other and with the stiffeners and doublers that attach as per the drawings. Then I disassembled, deburred, edge finished and dimpled the various parts as called out. |
||