| Date: |
6-18-2008 |
|
| Number of Hours: |
5.25 |
|
| Brief Description: |
Brake line and gear leg fairing installation |
|
|
Today I installed the brake lines from the fuselage bulkhead fitting to the brake assembly. Then I cut gear leg fairings as per the template on drawing C3. Lastly I cut the gear leg fairing hinges to length and drilled them. |
||