| Date: |
3-31-2008 |
|
| Number of Hours: |
2.25 |
|
| Brief Description: |
Fabricated the elevator push tube tunnel cover |
|
|
I back tracked in the assembly process today as I had not yet fabricated the elevator push tube tunnel cover. It involved fabricating from Z channel stock and aliminium sheet the F-741A and F-741B and fitting them to the cabin floor. |
||