| Date: |
3-4-2008 |
|
| Number of Hours: |
3.25 |
|
| Brief Description: |
Aft canopy frame preparations |
|
|
After returning from a much needed break from the earlier work session in the day I began preparing the aft canopy frame components. The F-631A channels needed their flanges adjusted to greater than 90 degrees.Then I fabricated four spacer blocks to go between the F-631A channels and the roll over bar. I also drilled the C-704 splice plate and match drilled it to one side of the F-631A channels. Then I clamped the F-631A channels to the roll over bar. |
||