| Date: |
1-12-2008 |
|
| Number of Hours: |
5.25 |
|
| Brief Description: |
Rollover bar, flap channel and instrument panel wo |
|
|
My brother Bernie assisted in match drilling the rollover bar to the attach angles at the F-705 bulkhead. Next we riveted the flap motor channel attach plate to the flap motor channel. Then we fabricated the F-721-D angle that is part of the instrument panel mounting. Finally we fabricated and match drilled the seal depressor angle to the sub panel. |
||