| Date: |
12-14-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Cabin and baggage are floor and side panel instal |
|
|
Today I installed the cabin and baggage area floors.I also worked on the baggage area side panels where I installed anchor nuts to allow for removal of the panels if desired. |
||