Date:    12-13-2007
Number of Hours:    5.50
Brief Description:    Empennage fairing installation
Today I installed the fairings on the elevators, rudder, vertical stabilizer and horizintal stabilizer. With all the fairings installed I unbolted the empennage from the fuselage and put all the various parts back in storage for the time being to make work space in the garage. I also deburred all the various attach bolt holes.