| Date: |
12-13-2007 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Empennage fairing installation |
|
|
Today I installed the fairings on the elevators, rudder, vertical stabilizer and horizintal stabilizer. With all the fairings installed I unbolted the empennage from the fuselage and put all the various parts back in storage for the time being to make work space in the garage. I also deburred all the various attach bolt holes. |
||