| Date: |
12-2-2007 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Vertical stabalizer mounting preparations |
|
|
Today I match drilled the F-781 vertical stabilizer attach plate to the horizontal stabilizer forward spar. I also fabricated the F-712D elevator up stop. The F-712D also bolts to the vertical stabilizer aft spar. |
||