| Date: |
11-30-2007 |
|
| Number of Hours: |
9.50 |
|
| Brief Description: |
Cabin and baggage floor rib anchor nut installatio |
|
|
The plans call for installing most of the cabin and baggage area floors using pulled rivets but I wanted to have access to the area under the floor panels without having to drill out rivets so I installed nut plates instead. |
||