| Date: |
11-10-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Forward deck preperation |
|
|
In a second session for the day my brother Bernie and I started by fabricating from stock angle numerous forward deck components including the F-721C, F-743B, F-768C, F-703B and F-703C angle brackets. We match drilled the F-703B and F-703C angles to the F-703 instument panel. We also drilled the F-746 engine control cable brackets the the instument panel and the sub panel. We also trimmed and prepared the F-644 channels for drilling to the sub panel. |
||